Closing a credit-eligibility loophole
WAC 51-11R-40621, footnote d, reads verbatim:
This option may only be claimed if serving System Type 4 or 5 from Table R406.2.
Early versions of the engine enforced none of this. A System Type 1 project — a gas furnace — could claim an option reserved for System Types 4 or 5, earn credits it wasn't entitled to, and be reported compliant. Caught in audit, fixed, and locked down with regression tests so it can't come back.
The 150-square-foot addition exemption
WAC 51-11R-50200, Section R502.1.1, reads verbatim:
Additions not greater than 150 square feet (13.9 m2) shall not be required to comply with Section R406.
The engine's tier classifier was routing additions under 150 square feet into the small-dwelling tier — demanding 5.0 credits — instead of treating them as exempt at 0 credits. Caught in audit and fixed forward with a dedicated exempt tier and 12 boundary tests.
At exactly 150 square feet, the code says two opposite things
An addition of exactly 150 square feet is, by the letter of the code, both exempt from Section R406 and required to earn 2.0 credits under it. Two provisions cover the same square footage and reach opposite conclusions.
WAC 51-11R-50200, Section R502.1.1:
Additions not greater than 150 square feet (13.9 m2) shall not be required to comply with Section R406.
“Not greater than 150” includes 150 — so a 150 sq ft addition is exempt. But Table R406.3, item 5:
Additions 150 square feet to 500 square feet: 2.0 credits
“150 to 500” also includes 150 — so the same addition owes 2.0 credits. Both readings are literal. Both are defensible from the text alone. The overlap is in the code, not in anyone's interpretation of it.
wsec.ai resolves it as exempt. R502 is the scoping section for additions — it decides which additions enter Section R406 at all, and Table R406.3 only prices projects that R502 sends there. An addition sitting exactly on the exemption line is de minimis: 150 square feet is about a 12′ × 12′ room, and the code drew its floor there deliberately. Charging the full 2.0-credit package at the exact threshold chosen as the cutoff would read the exemption out of the code.
This is an ambiguity in the WAC, not a defect in the engine, so we disclose it instead of quietly picking a side. Projects at exactly 150 square feet carry a caveat on both the calculator and the wizard showing both citations. If your building official reads it the other way, their reading governs — and the caveat gives you the citation to have that conversation before you submit.